The building, the land and its services belong to one plan. We connect prefabricated components with the foundations, assembly and utilities your Canadian project needs.
The components, transport and on-site work are coordinated around the agreed project specification.
The building system
One home Connected details
A modular home is more than a set of components. Explore the areas that are brought together in a coordinated project.
Exterior detail of the tiny-house example
The agreed building components are manufactured by our partner in Türkiye, then transported and assembled on the prepared Canadian site.
Dimensions and configuration agreed before production.
Transport, site access and lifting coordinated together.
Assembly connections and responsibilities defined.
The frame, wall and roof assemblies, insulation and glazing are considered together. Their specification is defined for the location, intended use and agreed configuration.
Structural requirements reviewed for the project.
Roof, insulation and glazing matched to the specification.
Technical details confirmed for the chosen site.
Doors, windows and the points where building elements meet are planned as connected details, with weather protection and the exterior finish considered in the project specification.
Openings aligned with the floor plan.
Junctions, seals and exterior details coordinated.
Facade and finish discussed with the client.
Grid connections or off-grid options are discussed around the location. Power, heating, water supply and wastewater need to work with the home and the site.
Available local connections reviewed.
Solar, storage and water treatment explored as options.
Supply systems included according to the chosen scope.
The level of interior completion follows the service scope you choose. Connections, finishes and the handover are coordinated within the agreed responsibilities.
Client work and MKO services clearly separated.
Interior completion agreed for the project.
Handover, service and maintenance options discussed.
The site comes first
A sound beginning For the place you choose
The foundation approach depends on the ground, frost conditions and local project requirements. These are options to discuss in the technical review for your site.
A pile-based approach, specified around the ground conditions and the loads defined for the project.
Concrete piers
Defined bearing points and levels, coordinated with the building configuration and site conditions.
Ground slab
A slab approach with ground preparation, drainage and insulation considered for the chosen location.
Energy & water
The home is one part The supply is another
Power, water and wastewater are part of the project conversation from the beginning. Explore the direction that fits the location you have in mind.
Energy
Available grid connections are coordinated with the home’s electrical and heating requirements.
Water
A local supply connection or a site-specific well solution is reviewed, together with any water treatment requirements.
Wastewater
A local connection or an appropriate on-site system is considered for the location and its project requirements.
Solar & storage
Photovoltaic and battery options are discussed around the site, intended use and expected energy demand.
Well & treatment
Well water and treatment options are reviewed around the available supply and the water quality at the site.
On-site wastewater
Septic or tank-based options are considered for the location, intended use and required local review.
Systems and capacities are selected for the individual project. Available connections, water quality, energy demand and local requirements need to be reviewed for your site.
A closer look at the exterior
Bring the parts together
The finish follows your chosen scope
Some clients take on the interior themselves. Others choose more of the work within a coordinated project. The construction specification and responsibilities follow the service scope you agree with MKO.